300-370 Dumps 300-370 Exam Questions 300-370 New Questions 300-370 PDF 300-370 VCE Cisco

[Full Version] 300-370 Exam Dumps New Updated By Cisco Official Exam Center (21-30)

2016 December Cisco Official New Released 300-370 Dumps in Lead2pass.com!

100% Free Download! 100% Pass Guaranteed!

Cisco New Released Exam 300-370 exam questions are now can be download from Lead2pass! All questions and answers are the latest! 100% exam pass guarantee! Get this IT exam certification in a short time!

Following questions and answers are all new published by Cisco Official Exam Center: http://www.lead2pass.com/300-370.html

QUESTION 21
An AP will be deployed to an area where DHCP Option 43 is unavailable and the WLAN engineer is unable to have DNS modifications made to support this AP.
Which two actions can enable the AP to join the WLC? (Choose two)

A.    Issue the clear capwap private-config command in the AP console.
B.    Pre-stage or prime the AP on the same Layer 2 VLAN as the WLC.
C.    Issue the capwap ap ip default-gateway WLC IP address command in the AP console.
D.    Issue the capwap ap ip address WLC IP address command in the AP console.
E.    Issue the capwap ap controller ip address WLC IP address command in the AP console.

Answer: BE

QUESTION 22
Refer to the exhibit. Which statement about the join process of the access point is true?

221

A.    The AP failed to join because the self-signed certificate of the AP was not correct on the controller.
B.    The time on the controller is outside of the certificates validity time interval so the join phase failed.
C.    The AP moved from this controller to its primary controller.
D.    The AP successfully joined the controller.

Answer: B

QUESTION 23
A Wireless LAN Cisco engineer is troubleshooting 802. 11ac WLAN at customer site Doe to interferences with neighboring 802 11n networks the engineer must determine the current primary secondary channel allocation to enhance the current configuration. Channel 60 has been chosen by the customer as primary 20 MHz channel. Which combination determines the resulting primary 40 MHz and primary 80 MHZ channels?

A.    primary 40 MHz channel 62, primary 80 MM: channel 58
B.    primary 40 MHz channel 54, primary 80 MHz channel 58
C.    primary 40 MHz channel 64, primary 80 MHz channel 60
D.    primary 40 MHz channel 60, primary 80 MHz channel 56

Answer: A

QUESTION 24
A wireless engineer has completed the configuration of a new WLAN on the existing Cisco wireless infrastructure. During testing he found that the wireless client’s authenticate and received the correct ip address from the switch, but they were not able to access any of the internal or external resources. Which action will resolve the issue?

A.    Configure static ip addresses for the wireless clients.
B.    Configure the default-router on the switch DHCP pool.
C.    Configure option 82 on the switch DHCP pool.
D.    Configure a dns-server on the switch DHCP pool.

Answer: C

QUESTION 25
Which channel width is the maximum that can be obtained by bonding two 802.11 ac subchannels according to US regulations?

A.    160 MHz
B.    120 MHz
C.    84 MHz
D.    240 MHz

Answer: A

QUESTION 26
Which statement about the usage of the debug command in a Cisco Unified Wireless Network is true?

A.    Debug is enabled until manual shut off.
B.    Debug is a message logging severity 7.
C.    Debug is a restricted command and is not available in the AP CLI.
D.    Debug is available on the WLC serial console and web interface.

Answer: B

QUESTION 27
Two 5508 Wireless Lan Controllers are managing all Access Points throughout the network The WLCs are located in different locations to provide geographical redundancy A Mobility Group has been configured on both WLCs and has a UP status on both Controllers The APs m location A are statically configured to use Controller A as the Primary and Controller B as the Secondary If the WLC in location A goes offline, the APs successfully join the WLC m location B but they do not failover to their Primary configured Controller.
What configuration task will fix this issue’

A.    Change the AP Failover Priority to critical.
B.    Enable AP Fallback globally on the WLC.
C.    Configure the WLC in location A as Primary using the CAPWAP AP Controller IP Address command on all the location A Access Points.
D.    Use DHCP Option 43 and specify WLC in location A as Primary.

Answer: C

QUESTION 28
Refer to the exhibit. A mobile station in a factory contains an AP configured as a work group bridge that authenticates to a root AP using EAP-FAST. To be able to use the mobile station in further parts of the factory, another root AP is installed and also configured for EAP-FAST When the mobile station is attempting to roam to the other AP, it loses connection yet can still authenticate to the first one. What is the cause for the failed authentication on RAP2?

281

A.    RAP1 is using a different authentication protocol than RAP2.
B.    RAP2 has a different SSID than RAP1.
C.    RAP1 is using a different encryption than RAP2.
D.    The authentication usemame and password is different.

Answer: A

QUESTION 29
Refer to the exhibit. A client reports being unable to log into the wireless network According to the output, which network information should be verified?

291

A.    the Failed Attempts log on the authentication server
B.    that the AP has IP connectivity to the authentication server
C.    that the user has an account on the authentication server
D.    that the authentication and accounting configuration are correct

Answer: B

QUESTION 30
Scenario
The Big Engineering IT team has been working in the lab to do some testing of some new features the existing network won’t support. They are AP Croups, AP Failover, and Local Web Auth. They have been having problems with all three features. In this test environment the controllers only support the Composite and Structural Engineering and Aerodynamic Engineering groups. All SSIDs should omit the department name. Refer to the exhibit. This is a diagram of the floor plan for the Big Engineering office and the distribution of the departments. The tables below show how the controllers have been configured.
Note, not all menu items, text boxes, or radio buttons are active.

301
302

303

304

305
When you review the configuration of the test network controller what needs to be changed to resolve the problems? (Choose four.)

A.    Change the High Availability Primary Controller Management Interface IP address.
B.    Remove the current WLANs and replace them with WLANs that have the same SSID names as on the AE-2504A controller.
C.    Add the Local Net User names and passwords
D.    Change the Layer 2 security to none and Layer 3 Security to Web Policy for the CSE- Contractors WLAN
E.    Remove me current WLAN from the CSE-WLAN AP Group and add all three of the WLANs configured in the CSE-2504A
F.    Add the CSE APs to the CSE-WLANs AP-Group.

Answer: ACDE

Lead2pass gives the latest, authoritative and complete 300-370 braindumps for 300-370 exam, because of that, all of our candidates pass 300-370 certification without any problem. The biggest feature is the regular update of 300-370 PDF and VCE, which keeps our candidates’ knowledge up to date and ensures their 300-370 exam success.

300-370 new questions on Google Drive: https://drive.google.com/open?id=0B3Syig5i8gpDeXZTcXZnWk5naVU

2016 Cisco 300-370 exam dumps (All 70 Q&As) from Lead2pass:

http://www.lead2pass.com/300-370.html [100% Exam Pass Guaranteed]